SCOPE OF DELIVERY
HOPPER UNIT
- hopper unit 140 m³
- 4 bins
- 5.000 kg weighing belt conveyor
MIXING PLANT
- Steel structure, skip hoist
- BHS -twin shaft mixer
- Hardened concrete per batch 2,0 m³
- Mixer dedusting: 2x airbag
- Mixer lining: Cast iron tiles, partly ceramic
- Material of side wear : Cast iron
- Admixure weigher 15/15 kg
- Cement weigher 1000 kg
- Water weigher 500 kg
- Compressor Boge, screwtype
- Bus system, Beckhoff
- power unit and electric equipment
- Dorner control
ACCESSORIES
- 3 pcs. cement silo á 100 t
- 5 bins, incl. 5 cement screws 60 t/h
- incl. cement screw, dust filter, aeration system with nozzles
- Additive supply
- (incl. 5 pcs. tanks x l and pumps 4 Würschum
- Container for additives
- Insulated claddings
- Container for control unit