Modernisation of Czech highway D1
24.04.2018
Concrete production on the highway D1 with continual-charge concrete mixing plant SBM EUROMIX 3000 CC+ and SBM EUROMIX 1600.
24.04.2018
Concrete production on the highway D1 with continual-charge concrete mixing plant SBM EUROMIX 3000 CC+ and SBM EUROMIX 1600.