New concrete mixing plant on the highway D1
12.07.2017
Right now the EUROMIX 3000 CC concrete plant is installed on the D1 motorway – 81.km.
The high-performance concrete plant will produce concrete for the lower layer of the CB cover in section 10 – Hořice – Koberovice.